1. Pull over to a safe location and turn on the vehicle’s Hazard Warning flashers.
2. Verify that the valve stem (on the wheel with the deflated tire) is in a position that is near to the ground.
This will allow the TIREFIT Hoses (6) and (7) to reach the valve stem and keep the TIREFIT kit flat on the ground.
This will provide the best positioning of the kit when injecting the sealant into the deflated tire and running the air pump. Move the vehicle as necessary to place the valve stem in this position before proceeding.
3. Place the transmission in PARK (auto transmission) or in Gear (manual transmission) and turn Off the ignition.
4. Set the parking brake.
See also:
Overview
The new 2012 Fiat Punto builds on the Italian company's heritage of producing
mould-breaking, class leading small cars. Aimed at the most competitive and
dynamic sector of the car market, the 2012 ...
Sunroof
It is controlled electrically and it will only work when the ignition key is
at MAR.
Sunroof is controlled by a switch. When you release it the roof locks in the
position it is at that moment.
...
Lap/Shoulder Belts
All the seating positions in your vehicle are equipped with combination lap/shoulder
belts.
The belt webbing retractor is designed to lock during very sudden stops or accidents.
This feature allo ...


